Hardware · Vehicle
Sensor & ECU Capture
Ruggedized gateways tap CAN-FD, Automotive Ethernet, and LiDAR streams with galvanic isolation and EMC hardening.
CloudCAN builds vehicle edge gateways and fleet telemetry planes that ingest LiDAR, ECU, and powertrain signals through RTOS bridges—delivering deterministic latency for autonomy and OEM platforms.
$ cloudcan telem —bus=CAN-FD —gateway=rtos
[OK] LiDAR frames multiplexed @ 20Hz
[✓] ECU fault codes streamed (ISO-TP)
[OK] Edge buffer underrun = 0
[✓] Fleet dashboard lag = 42ms
$ certify --standard=ISO-26262 ASIL-B
▸ awaiting operator input
< 50ms
Fleet Telemetry Lag
Edge → dashboard
99.999%
Gateway Uptime
Dual-SIM / satellite failover
ASIL-B+
Safety Pathways
ISO 26262 aligned
[ Flagship Architecture Matrix ]
Full-stack engineering mapped to your industry's physical and digital control planes.
Hardware · Vehicle
Ruggedized gateways tap CAN-FD, Automotive Ethernet, and LiDAR streams with galvanic isolation and EMC hardening.
Firmware · RTOS
FreeRTOS / Zephyr pipelines normalize frames, enforce QoS, and store-and-forward through coverage gaps.
Software · AI
Predictive maintenance models, geofenced OTA, and digital-twin dashboards fed by continuous telemetry.
[ Live Systems Telemetry ]
Animated packets travel from LiDAR and engine sensors through an edge RTOS gateway into a live cloud telemetry dashboard.
[ De-Siloing Protocol ]
Bridge decades of OEM tooling into a modern mobility fabric without stopping the line—dual-write from legacy diagnostics while new CAN-edge paths come online.
| Legacy Monolith | CloudCAN Bridge | Modern Edge Plane |
|---|---|---|
| OBD batch dumps / dealer tools | CAN-FD edge adapters | Continuous fleet telemetry |
| Cellular blackbox logging | RTOS store-and-forward | Multi-path MQTT / 5G uplink |
| Siloed ECU vendor tooling | Normalized signal catalogs | Unified digital-twin schemas |
| Manual OTA campaigns | Signed staged rollouts | Geofenced autonomous OTA |
[ Sovereign Security ]
Functional safety and cyber-resilience engineered into the vehicle-to-cloud path.
[ 12-Week Engagement Framework ]
Phase 01 · Weeks 1–4
Threat model, systems inventory, edge topology design, CI/CD scaffolding, and zero-trust network blueprints signed off by principal engineers.
Phase 02 · Weeks 5–8
Firmware, middleware, and API surfaces land on production-grade hardware. Observability, failover, and sovereign data planes go live in staging.
Phase 03 · Weeks 9–12
Chaos and load validation, compliance evidence packs, runbooks, and full knowledge transfer to your internal platform team.
Initiate discovery to map CAN topologies, RTOS gateway needs, and cloud telemetry ROI for your mobility platform.